The Thiokol Utah Division (Wasatch Division) was opened in 1957
for Minuteman first stage production. The production plant
in Brigham City, Utah was later supplemented by Shuttle SRB
production in Promontory, Utah.
Solid propulsion systems
TX-16-1 (M16E1) for Mace, Matador (Thiokol/Wasatch)